Lake Havasu Marina, AZ, Fuel Farm

Key Info

Project Details

Two symmetrical orange arrows pointing right, forming a square with a white diagonal cross.
Delivery Method Design-Build
 

KEAR completed fuel farm construction at Lake Havasu Marina, including three 10,000-gallon aboveground storage tanks and a marine fuel distribution piping system. The project also included three fuel dispensers and dock fueling stations, fuel system controls and leak detection, and concrete tank foundations and a loading slab. KEAR’s scope included electrical work, a point-of-sale (POS) system and owner training.

Scroll to Top