Portfolio

Description.

Industrial water treatment facility in Lake Havasu City with large pink pipes and steel structures under a clear blue sky.

Lake Havasu City, AZ, Mulberry WWTP Tertiary Filter Capacity Increase

Key Info Lake Havasu City Project Details Delivery Method Design-BuildKEAR provided complete design-build services to upgrade 2 existing tertiary filters and add another to the existing filter train at the Lake Havasu Mulberry WWTP. The project included the relocation of two existing Schreiber Fuzzy Filters to allow for the installation of a third new filter

Lake Havasu City, AZ, Mulberry WWTP Tertiary Filter Capacity Increase Read More »

Large green industrial water tank with a level gauge and a smaller attached cylinder, situated in a fenced area with a clear blue sky, maintained by the City of Flagstaff.

Flagstaff, AZ, Continental Well

Key Info City of Flagstaff Project Details Delivery Method Job Order Contract As part of KEAR’s JOC with the City of Flagstaff for Water Facility Construction, this project involved the construction of a 21,000-gallon water storage tank, demolition and replacement of pipe, pumps and equipment inside the existing pump house, distribution piping, retaining wall construction and

Flagstaff, AZ, Continental Well Read More »

A construction site in Phoenix, AZ with large blue pipes laid out along a dug trench for the CAP Dual Waterlines project, featuring excavation machinery and hills in the background.

Phoenix, AZ, CAP Dual Waterlines to Headquarters

Key Info Central Arizona Project Project Details Delivery Method Design-Bid-Build This project included the repair and upgrades to the existing water system and booster stations at Camp Pendleton. Included were the complete replacement of 2 booster pump stations, building upgrades, demolition of an existing redwood water storage tank and new electrical and controls upgrades for both

Phoenix, AZ, CAP Dual Waterlines to Headquarters Read More »

Industrial boiler room with large pipes, valves, and control panels on concrete walls in Sedona, AZ.

Sedona, AZ, Major Lift Station

Key Info City of Sedona Project Details Delivery Method Construction Manager at RiskKEAR was selected as the Construction Manager at Risk (CMAR) for the design and construction phase services for the major lift stations upgrades project. For the design phase of the project KEAR provided design phase cost budgeting, constructability reviews, value engineering and site investigations.

Sedona, AZ, Major Lift Station Read More »

A construction site with a crane near large storage tanks in Prescott Valley, workers on site, and various construction vehicles and equipment.

Prescott Valley, AZ, Mingus West Offsite Water System

Key Info Dorn Homes Project Details Delivery Method Design-Bid-Build This project included the construction of a new pump house, 3000 lf of 10 inch water distribution pipeline, 2 new 175,000 gallon water storage tanks including new electrical service and all associated process controls. The project provides water service to several new housing developments nearby being constructed

Prescott Valley, AZ, Mingus West Offsite Water System Read More »

Entrance sign of Kartchner Caverns State Park with a mountain backdrop under a clear blue sky.

Kartchner Caverns, AZ, Water Treatment Plant & Water System Upgrade

Key Info Arizona Department of Administration Project Details Delivery Method Construction Manager at Risk   This CMAR project consisted of two phases. Phase 1 included the installation of a new Bioclere package Water Treatment Plant, refurbishment and reuse of existing concrete tanks, existing lift station upgrades and new piping & electrical systems. Also included in

Kartchner Caverns, AZ, Water Treatment Plant & Water System Upgrade Read More »

Industrial water pumping station at Camp Pendleton with large blue pipes and electric motors mounted on concrete bases in a utility room.

Camp Pendleton, CA, Area 33 Water System Improvements

Key Info NAVFAC Project Details Delivery Method Design-BuildThis project included the repair and upgrades to the existing water system and booster stations at Camp Pendleton. Included were the complete replacement of 2 booster pump stations, building upgrades, demolition of an existing redwood water storage tank and new electrical and controls upgrades for both sites. The project

Camp Pendleton, CA, Area 33 Water System Improvements Read More »

Scroll to Top