Tucson International Airport, AZ, Airside Fillstand Repairs

Key Info

Project Details

Two symmetrical orange arrows pointing right, forming a square with a white diagonal cross.
Delivery Method Design-Bid-Build
 

KEAR completed Tucson airport fillstand repairs for Tucson Fuel Facilities at Tucson International Airport. The project included demolition, piping modifications and installation of new fueling components, including a load meter, truck loading valve and load computer. The work also included pressure monitoring and fillstand safety upgrades, followed by system testing, startup and commissioning.

Scroll to Top