Ground Vehicle

Electrical conduits and concrete forms during construction at the Tooele fuel facility.

USACE Tooele, UT, Fuel Repairs

Key Info Tooele Army Depot UT USACE Omaha District Project Details Delivery Method Design-Build KEAR completed fuel facility repairs for the U.S. Army Corps of Engineers at Tooele. The work included upgrades to MOGAS and diesel fuel tanks, electronic leak detection systems, and emergency fuel shutoff systems. The project also included electrical and lighting work, fueling and

USACE Tooele, UT, Fuel Repairs Read More »

Floating boat slips, access ramp and solar-powered lights at a marina.

Lake Havasu Marina, AZ, Fuel Farm

Key Info Lake Havasu City, AZ Chemehuevi Indian Tribe Project Details Delivery Method Design-Build  KEAR completed fuel farm construction at Lake Havasu Marina, including three 10,000-gallon aboveground storage tanks and a marine fuel distribution piping system. The project also included three fuel dispensers and dock fueling stations, fuel system controls and leak detection, and concrete

Lake Havasu Marina, AZ, Fuel Farm Read More »

A picture of fuel system storage vaults.

City of Mesa 6th Street Service Center, AZ, Ground Fuel Vault Repairs

Key Info 6th Street Service Center Project Details Delivery Method Design-Bid-Build  KEAR completed City of Mesa fuel vault repairs, including repairs and resealing of vaults serving one diesel tank and two gasoline tanks at the 6th Street facility. The work included replacing tank sumps, installing new concrete slabs and pavement, modifying existing chain-link fencing, and

City of Mesa 6th Street Service Center, AZ, Ground Fuel Vault Repairs Read More »

A picture of ADOT's ground fuel storage tank being hoisted into place.

ADOT Quartzsite Maintence Office, AZ, Ground Fuel Facility Improvements

Key Info Arizona Department of Transportation Project Details Delivery Method Design-Bid-Build  KEAR provided construction services for the ADOT Quartzsite fuel facility improvements at the Arizona Department of Transportation’s fleet facility. The project included installation of a new 12,000-gallon, double-wall aboveground steel tank for unleaded fuel, a tank pad and piping to the remote fuel dispensing

ADOT Quartzsite Maintence Office, AZ, Ground Fuel Facility Improvements Read More »

A picture of Havasu Landing's ground fuel dispensers.

Havasu Landing Resort, CA, Ground Fuel Facility Improvements

Key Info Havasu Landing Resort & Casino Project Details Delivery Method Design-Build  KEAR provided design-build services for the Havasu Landing fuel facility for the Havasu Landing Resort and Chemehuevi Indian Tribe. As a design-build project, KEAR’s project team provided complete design and construction services for the installation of 3 new above-ground fuel storage tanks. These

Havasu Landing Resort, CA, Ground Fuel Facility Improvements Read More »

Fuel piping, valves and meter at the Picatinny Arsenal ground fuel facility.

Picatinny Arsenal, NJ, Ground Fuel System Improvements

Key Info Picatanny Arsenal Project Details Delivery Method Design-Bid-Build KEAR completed Picatinny Arsenal ground fuel system work, including improvements to the truck loading and unloading facility and construction of a containment basin. The project also included fuel transfer system upgrades, overfill protection and metering, and roadway and site improvements. KEAR completed testing and startup of the

Picatinny Arsenal, NJ, Ground Fuel System Improvements Read More »

Scroll to Top