KEAR

About KEAR Water

Two symmetrical orange arrows pointing right, forming a square with a white diagonal cross.

WATER/WASTEWATER CONSTRUCTION SERVICES

KEAR provides a complete package of services for water and wastewater treatment facility construction. We maintain the capability to self-perform nearly all major construction phases including excavation & backfill, mechanical & process piping, process equipment installation, cast-in-place concrete, and complete facility startup and testing services.

Water/ Wastewater Services

Two symmetrical orange arrows pointing right, forming a square with a white diagonal cross.

Wastewater Treatment Plants & Lift Stations

For over 20 years KEAR has been upgrading lift stations and wastewater treatment facilities. Our team is well versed at the regulatory requirements that municipalities and private facility operators are held to. Our staff understands plant processes and facility operational needs. From the replacement of small valves to full blown new plant construction – KEAR maintains the resources to tackle any project that conveys or treats wastewater. We can deliver your project through JOC, CMAR, Design-Build or traditional Design-Bid-Build delivery methods.

KEAR offers the following upgrade & expansion services for lift stations & wastewater treatment plant facilities:

Water Treatment Plants & Pump Stations

KEAR provides a complete package of services for new water treatment facility construction as well as the expansion and upgrading of existing facilities. We maintain the capability to self-perform nearly all industrial construction phases, including structural excavation and backfill, mechanical & process piping, process equipment installation, structural cast-in-place and precast concrete installation, and complete facility startup and testing services.

KEAR offers the following upgrade & expansion services for a wide range of water and wastewater treatment plant facilities:

Job Order Contracting, CMAR & Design-Build

Job Order Contracting – As a pioneer in the Job Order Contracting world, KEAR’s CEO developed our financial and project management systems around delivering multiple projects simultaneously. From simple small Job Orders to large complex challenges- KEAR maintains the talent and resources to manage any Job Order Contract.

Design-Build – KEAR maintains partnerships with industry leading engineering firms to bring a complete turn-key and single point of contact approach to any size project. Our established Professional Agreements and extensive experience with these firms ensure complete collaboration and teamwork from project conceptual planning to construction completion.

Construction Manager at Risk – KEAR embraces the working partnership that the CMAR delivery method requires and we understand the benefits that this delivery method brings to any construction program. The professionals at KEAR use an open-book approach that these projects require. We bring years of design analysis, contractibility review, cost estimation, scheduling, procurement, and construction experience to each CMAR project we execute.
o Map – delet

Projects Across the Nation

KEAR has been responsible for constructing and commissioning hydrant fueling systems at some of the largest commercial airports and military installations in the United States. Our experience ranges from hydrant pit relocations to full-blown new hydrant fuel systems for airport expansion projects. Since our incorporation, KEAR has installed hundreds of hydrant fuel pits and commissioned major systems responsible for fueling some of the largest aircraft currently in service. We maintain the corporate qualifications, personnel resources, and quality control program necessary to deliver these specialized projects by following the strict regulatory constraints.

 

FEATURED PROJECTS​

Two symmetrical orange arrows pointing right, forming a square with a white diagonal cross.

Lake Havasu City, AZ-Mulberry WWTP Expansion

Goodyear, AZ-Rainbow Valley 5MG Reservoir & Pump Station

U.S. Army Corps Of Engineers-Eunice, AZ-Wastewater Treatment Plant Improvements

Canon Air Force Base, Clovis, NM-ADAL Wastewater Treatment Plant Expansion

Naval Base Point Loma – San Diego, CA-Upgrade Pump Station A42- Design Build

Torrance, CA-Sodium Fluoride Feed Station

Hear From Our Clients

Two symmetrical orange arrows pointing right, forming a square with a white diagonal cross.
Two symmetrical orange arrows pointing right, forming a square with a white diagonal cross.

Bid Requests

Name(Required)
MM slash DD slash YYYY
MM slash DD slash YYYY
Scroll to Top