Torrance, CA, Sodium Fluoride Feed Station

Key Info

Project Details

Two symmetrical orange arrows pointing right, forming a square with a white diagonal cross.
Delivery Method Design-Bid-Build
 
KEAR provided prime contractor construction services on the Sodium Fluoride Feed system project for the City of Torrance, California. The project was located at two separate locations within the City of Torrance; The Robert W. Goldsworthy Desalter facility, and Well No. 9. KEAR installed skid mounted fluoride feed systems at each location, including chemical feed pumps, drive motors, control panels and SCADA system upgrades. Supporting infrastructure for the new systems were also installed including new injection and feed piping, support slabs and general site work improvements.
Scroll to Top