ADOT Quartzsite Maintence Office, AZ, Ground Fuel Facility Improvements

Key Info

Project Details

Two symmetrical orange arrows pointing right, forming a square with a white diagonal cross.
Delivery Method Design-Bid-Build
 

KEAR provided fuel system construction services to ADOT’s fleet facility in Quartzsite, AZ. The project included installation of a double-wall, above ground storage tank and tank pad, a new unleaded 12,000 gallon secondary containment above ground steel storage tank and piping to the remote fuel dispensing island. KEAR also upgraded the existing 4,000 gallon diesel tank, installed a new submersible turbine pump and rerouted the existing diesel product piping to the fuel island. Site improvements included a new concrete drive, asphalt pavement roadway and restoration of removed surfaces.  

Scroll to Top