Los Angeles International Airport, CA, Terminal 4 Gate Enhancement Hydrant Fuel Pits
Key Info
- Los Angeles International Airport CA
- Hydrant Fuel System
- American Airlines
Project Details

Delivery Method Design-Bid-Build
KEAR was contracted to complete hydrant fuel pit modifications for the Terminal 4 (T4) Gate Enhancement Project at Los Angeles International Airport. The project included the installation of new hydrant pits and associated lateral piping to facilitate revised aircraft parking configurations. KEAR executed all aspects of the fueling system modification scope including system drain-down, new pit/lateral installation and the testing/flushing of all installed components.