Harry Reid International Airport, NV, West Side Tank
Key Info
- Las Vegas NV
- General Aviation
- Harry Reid International Airport
Project Details
Delivery Method Design-Bid-Build
KEAR completed fuel system modifications that included removing an existing 30,000-gallon mogas tank and a 15,000-gallon waste fuel tank, and converting an existing 30,000-gallon avgas tank to diesel service. The team installed a new owner-supplied, 30,000-gallon, two-compartment tank for avgas and waste fuel, along with new issue and receipt piping. The project also included load rack modifications, a new load/offload position adjacent to the existing rack, controls, and installation of an owner-supplied pump motor.