McCarran International Airport, NV, West Side Tank

Key Info

Project Details

Two symmetrical orange arrows pointing right, forming a square with a white diagonal cross.
Delivery Method Design-Bid-Build
 

KEAR was selected to replace an existing AST that was out of service with a new owner supplied 2 compartment AST and provide a new load/offload position adjacent to existing. The project included piping modifications, controls and installation of a new owner supplied pump motor.

Scroll to Top