KEAR was contracted by Holder Construction to build the hydrant fuel system for the new eight-gate remote satellite concourse at Nashville International Airport. The project was completed in phases, beginning with a transfer pipeline from the tank farm to the new concourse. The work also included 1,800 linear feet of 8-inch fuel main, a pipeline tie-in, eight hydrant pits, low-point and high-point assemblies, and an emergency fuel shutoff (EFSO) system. KEAR completed the required flushing, testing and commissioning of the system.