Nashville International Airport, TN, Satellite Concourse Hydrant Fuel System

Key Info

Project Details

Two symmetrical orange arrows pointing right, forming a square with a white diagonal cross.
Delivery Method Construction Manager at Risk

KEAR was contracted by Holder Construction to construct the hydrant fuel system for the new 8-gate remote satellite concourse at Nashville International Airport. The project was phased to include the first phase of pipeline from the tank farm to the new terminal. The second phase was the construction of the system at the new terminal itself including all 8 hydrant pits, low points, high points and required flushing, testing and commissioning.