Picatinny Arsenal, NJ, Ground Fuel System Improvements

Key Info

Project Details

Two symmetrical orange arrows pointing right, forming a square with a white diagonal cross.
Delivery Method Design-Bid-Build
 
KEAR completed Picatinny Arsenal ground fuel system work, including improvements to the truck loading and unloading facility and construction of a containment basin. The project also included fuel transfer system upgrades, overfill protection and metering, and roadway and site improvements. KEAR completed testing and startup of the system.
Scroll to Top