San Carlos Apache Tribe, AZ, Fuel Farm

Key Info

Project Details

Two symmetrical orange arrows pointing right, forming a square with a white diagonal cross.
Delivery Method Design-Bid-Build
 
The project included installing a new fuel farm, including one 12,000-gallon UL2085 Fireguard Jet Fueling System and one 12,000-gallon UL2085 Fireguard Avgas Fueling system. KEAR installed the new systems on new concrete pads and installed all necessary pumps, valves and electrical components. New primary power was installed from an offsite location.
 
Scroll to Top