San Diego International Airport, CA, Fuel Offload Island and System Upgrades
Key Info
- San Diego CA
- Featured, Hydrant Fuel System
- Allied Aviation of San Diego
Project Details
Delivery Method Design-Bid-Build
KEAR was contracted to construct the new improvements to the jet fuel delivery system at the San Diego International Airport. A previous study identified the need for two additional refueler loading islands. The project involved various upgrades to the existing fuel load islands including a new remote loading position, new pump, fuel offload control system and piping modifications. In addition, new inventory management software was installed and the existing human-machine interface (HMI) system was replaced along with various electrical upgrades.