San Diego International Airport, CA, West Refueler Loading Facility

Key Info

Project Details

Two symmetrical orange arrows pointing right, forming a square with a white diagonal cross.

Delivery Method Construction Manager at Risk

KEAR provided aviation fuel system construction services for the West Refueler Loading Facility at San Diego International Airport. The project included a five-bay truck loading rack and a new 10-inch rack supply pipeline. KEAR completed two critical tie-ins, including a 14-inch transfer line tie-in, and loaded, tested and flushed more than 6,200 linear feet of 14-inch transfer pipeline serving the facility. To support flushing, KEAR constructed two temporary fuel storage facilities to handle the movement and storage of more than 200,000 gallons of jet fuel. The work also included fuel system commissioning.