Delivery Method Design-Bid-Build
 

The Sedona Oak Creek Airport Authority contracted KEAR to provide fuel farm upgrade and replacement services at the Sedona Oak Creek Airport. This project included the installation of 2 new 15,000 gallon and 1 new 12,000 gallon double walled above ground storage tanks, new access platforms and stairs, bulk fuel loading skids, new fuel system piping and supports, a new concrete containment basin, new concrete and asphalt access drive, containment piping, storm drain piping, electrical and control systems.