Delivery Method Construction Manager at Risk
 

As part of the demolition of the old Terminal 2 at Phoenix Sky Harbor, KEAR provided complete removal and capping of the existing fuel hydrant system on both the east and west sides. The removal of the line was necessary for the new construction of Taxiway D, which was being relocated. KEAR completed the drain-down, flushing, capping, installation of new high-point risers, inspection pits and all concrete restoration within the tight schedule requirements for the overall project.