KEAR performed design and construction phase services on this CMAR project which included 18 new hydrant pits, 4,300 LF of hydrant fuel system pipe replacement, isolation valve vaults, transmission main pipeline, 2 new loading racks and new isolation valve vaults. KEAR provided all fuel system testing, flushing and commissioning to provide the Tucson Airport Authority with a compliant system.