Tucson International Airport, AZ, Main Terminal Apron Reconstruction

Key Info

Project Details

Two symmetrical orange arrows pointing right, forming a square with a white diagonal cross.
Delivery Method Construction Manager at Risk

 

KEAR provided design and construction phase services for this CMAR project at Tucson International Airport. The project included the installation of 18 new hydrant pits, replacement of 4,300 LF of hydrant fuel system piping and the transmission main pipeline, construction of two new loading racks, and installation of new isolation valve vaults. KEAR also performed all fuel system testing, flushing, and commissioning, delivering a fully compliant fueling system for the Tucson Airport Authority.

 