USACE, Marine Corps Air Station Yuma, AZ, Fuel Repairs III
Key Info
- Yuma AZ
- Bulk Fuel Storage
- USACE, MCAS Yuma
Project Details

Delivery Method Design-Build
As the design-build prime contractor, KEAR was contracted by the USACE Omaha District to perform various fuel system upgrades and to construct a new crew building at MCAS Yuma, AZ. As part of the project, KEAR repaired the existing fillstands, replaced various fuel system components, installed a new vapor recovery system and upgraded various emergency systems. The site was improved with new pavement and markings, relocated emergency eyewash stations, new bollards and various concrete replacements. A new masonry crew building was also constructed along with various interior improvements to adjacent structures.