Flagstaff AZ

A four-blade mixer impeller attached to a vertical shaft inside a tank.

Flagstaff, AZ, Rio de Flag Wastewater Treatment Plant Anoxic Mixer Replacement

Key Info City of Flagstaff Project Details Delivery Method Job Order Contract  This JOC project included the demolition and replacement of anoxic mixers at the Rio de Flag Water Reclamation Facility. Work also included associated electrical upgrades, including VFD cabinets, conduit and wiring, while utilizing existing infrastructure where feasible.  

Flagstaff, AZ, Rio de Flag Wastewater Treatment Plant Anoxic Mixer Replacement Read More »

Large green industrial water tank with a level gauge and a smaller attached cylinder, situated in a fenced area with a clear blue sky, maintained by the City of Flagstaff.

Flagstaff, AZ, Continental Well

Key Info City of Flagstaff Project Details Delivery Method Job Order Contract As part of KEAR’s JOC with the City of Flagstaff for Water Facility Construction, this project involved the construction of a 21,000-gallon water storage tank, demolition and replacement of pipe, pumps and equipment inside the existing pump house, distribution piping, retaining wall construction and

Flagstaff, AZ, Continental Well Read More »

An exterior view of a beige stone building at the Lake Mary Water Treatment Plant with an open door, featuring a brown roof and a small window.

Flagstaff, AZ, Lake Mary Water Treatment Plant Chlorine Dioxide Facility

Key Info City of Flagstaff Project Details Delivery Method Design-Bid-Build As the prime contractor, KEAR constructed a new chlorine dioxide facility for the City of Flagstaff at the Lake Mary Water Treatment Plant. The new masonry building addition houses a new chlorine dioxide system for treatment of raw water from Lake Mary. The project included the

Flagstaff, AZ, Lake Mary Water Treatment Plant Chlorine Dioxide Facility Read More »