San Diego CA

Industrial pump room with blue and red pipes, valves, and meters in a concrete building at Naval Base Point Loma.

Naval Base Point Loma San Diego, CA, Upgrade Pump Station A42

Key Info Department of the Navy – Naval Facilities Engineering Command (NAVFAC) Southwest Project Details Delivery Method Design-BuildKEAR was contracted by NAVFAC Southwest to provide complete design-build services for upgrades to the existing Pump Station A42 at Naval Base Point Loma, San Diego, CA. As the design-build prime contractor, KEAR managed the pre-construction phase including all

Naval Base Point Loma San Diego, CA, Upgrade Pump Station A42 Read More »

Industrial site with pipeline valves and meters on a clear day, featuring a large storage tank and a fuel offload island in the background.

San Diego International Airport, CA, Fuel Offload Island and System Upgrades

Key Info Allied Aviation of San Diego Project Details Delivery Method Design-Bid-BuildKEAR was contracted to construct the new improvements to the jet fuel delivery system at the San Diego International Airport. A previous study identified the need for two additional refueler loading islands. The project involved various upgrades to the existing fuel load islands including

San Diego International Airport, CA, Fuel Offload Island and System Upgrades Read More »

View of a toll booth station with multiple lanes, cars passing through, and a calm river and green sports fields in the background under a clear sky near the San Diego International Airport.

San Diego International Airport, CA, West Refueler Loading Facility

Key Info SCDRAA Project Details Delivery Method Construction Manager at Risk KEAR provided aviation fuel system construction services for the West Refueler Loading Facility at San Diego International Airport. The project included a five-bay truck loading rack and a new 10-inch rack supply pipeline. KEAR completed two critical tie-ins, including a 14-inch transfer line tie-in,

San Diego International Airport, CA, West Refueler Loading Facility Read More »

Scroll to Top