Sedona AZ

Industrial boiler room with large pipes, valves, and control panels on concrete walls in Sedona, AZ.

Sedona, AZ, Major Lift Station

Key Info City of Sedona Project Details Delivery Method Construction Manager at RiskKEAR was selected as the Construction Manager at Risk (CMAR) for the design and construction phase services for the major lift stations upgrades project. For the design phase of the project KEAR provided design phase cost budgeting, constructability reviews, value engineering and site investigations.

Sedona, AZ, Major Lift Station Read More »

Fenced airport fuel facility with storage tanks and a fuel truck, with aircraft and red rock mountains in the background.

Sedona Airport, AZ, New Fuel Farm

Key Info Sedona-Oak Creek Airport Authority Project Details Delivery Method Design-Bid-Build  The Sedona Oak Creek Airport Authority contracted KEAR to provide fuel farm upgrades and replacement at Sedona Airport.  The project included two new 15,000-gallon and one new 12,000-gallon double-walled, UL 2085 aboveground storage tanks. KEAR also installed access platforms and stairs, bulk fuel loading

Sedona Airport, AZ, New Fuel Farm Read More »

Industrial shredder machine in a wastewater reclamation plant with a conveyor belt system under a metal roof.

Sedona, AZ, Wastewater Reclamation Plant Upgrades

Key Info City of Sedona Project Details Delivery Method Design-Bid-Build This project consisted of miscellaneous upgrades to the existing wastewater reclamation facility in the City of Sedona. The existing aeration system was upgraded and expanded to handle increased flows, including new aeration system, FRP baffles, new mixers and new return pumps. The existing solids handling building

Sedona, AZ, Wastewater Reclamation Plant Upgrades Read More »

Scroll to Top