Water Treatment Plants & Pump Stations

An industrial site featuring pipelines and a pump station, with various machinery on concrete bases, under a clear sky and distant mountains in the background.

Goodyear, AZ, Rainbow Valley 5MG Reservoir & Pump Station

Key Info City of Goodyear Project Details Delivery Method Design-Build As a subcontractor for MA Mortenson, KEAR provided mechanical construction services for the 5MG reservoir and pump station in Goodyear, Arizona. This project includes the installation, startup and testing of a new vertical turbine pump station and all related suction and discharge piping. Also included in […]

Goodyear, AZ, Rainbow Valley 5MG Reservoir & Pump Station Read More »

Industrial pump room with blue and red pipes, valves, and meters in a concrete building at Naval Base Point Loma.

Naval Base Point Loma San Diego, CA, Upgrade Pump Station A42

Key Info Department of the Navy – Naval Facilities Engineering Command (NAVFAC) Southwest Project Details Delivery Method Design-BuildKEAR was contracted by NAVFAC Southwest to provide complete design-build services for upgrades to the existing Pump Station A42 at Naval Base Point Loma, San Diego, CA. As the design-build prime contractor, KEAR managed the pre-construction phase including all

Naval Base Point Loma San Diego, CA, Upgrade Pump Station A42 Read More »

An exterior view of a beige stone building at the Lake Mary Water Treatment Plant with an open door, featuring a brown roof and a small window.

Flagstaff, AZ, Lake Mary Water Treatment Plant Chlorine Dioxide Facility

Key Info City of Flagstaff Project Details Delivery Method Design-Bid-Build As the prime contractor, KEAR constructed a new chlorine dioxide facility for the City of Flagstaff at the Lake Mary Water Treatment Plant. The new masonry building addition houses a new chlorine dioxide system for treatment of raw water from Lake Mary. The project included the

Flagstaff, AZ, Lake Mary Water Treatment Plant Chlorine Dioxide Facility Read More »

Large green industrial water tank with a level gauge and a smaller attached cylinder, situated in a fenced area with a clear blue sky, maintained by the City of Flagstaff.

Flagstaff, AZ, Continental Well

Key Info City of Flagstaff Project Details Delivery Method Job Order Contract As part of KEAR’s JOC with the City of Flagstaff for Water Facility Construction, this project involved the construction of a 21,000-gallon water storage tank, demolition and replacement of pipe, pumps and equipment inside the existing pump house, distribution piping, retaining wall construction and

Flagstaff, AZ, Continental Well Read More »

A construction site in Phoenix, AZ with large blue pipes laid out along a dug trench for the CAP Dual Waterlines project, featuring excavation machinery and hills in the background.

Phoenix, AZ, CAP Dual Waterlines to Headquarters

Key Info Central Arizona Project Project Details Delivery Method Design-Bid-Build This project included the repair and upgrades to the existing water system and booster stations at Camp Pendleton. Included were the complete replacement of 2 booster pump stations, building upgrades, demolition of an existing redwood water storage tank and new electrical and controls upgrades for both

Phoenix, AZ, CAP Dual Waterlines to Headquarters Read More »

A construction site with a crane near large storage tanks in Prescott Valley, workers on site, and various construction vehicles and equipment.

Prescott Valley, AZ, Mingus West Offsite Water System

Key Info Dorn Homes Project Details Delivery Method Design-Bid-Build This project included the construction of a new pump house, 3000 lf of 10 inch water distribution pipeline, 2 new 175,000 gallon water storage tanks including new electrical service and all associated process controls. The project provides water service to several new housing developments nearby being constructed

Prescott Valley, AZ, Mingus West Offsite Water System Read More »

Industrial water pumping station at Camp Pendleton with large blue pipes and electric motors mounted on concrete bases in a utility room.

Camp Pendleton, CA, Area 33 Water System Improvements

Key Info NAVFAC Project Details Delivery Method Design-BuildThis project included the repair and upgrades to the existing water system and booster stations at Camp Pendleton. Included were the complete replacement of 2 booster pump stations, building upgrades, demolition of an existing redwood water storage tank and new electrical and controls upgrades for both sites. The project

Camp Pendleton, CA, Area 33 Water System Improvements Read More »

Scroll to Top