Water

An exterior view of a beige stone building at the Lake Mary Water Treatment Plant with an open door, featuring a brown roof and a small window.

Flagstaff, AZ, Lake Mary Water Treatment Plant Chlorine Dioxide Facility

Key Info City of Flagstaff Project Details Delivery Method Design-Bid-Build As the prime contractor, KEAR constructed a new chlorine dioxide facility for the City of Flagstaff at the Lake Mary Water Treatment Plant. The new masonry building addition houses a new chlorine dioxide system for treatment of raw water from Lake Mary. The project included the

Flagstaff, AZ, Lake Mary Water Treatment Plant Chlorine Dioxide Facility Read More »

Industrial shredder machine in a wastewater reclamation plant with a conveyor belt system under a metal roof.

Sedona, AZ, Wastewater Reclamation Plant Upgrades

Key Info City of Sedona Project Details Delivery Method Design-Bid-Build This project consisted of miscellaneous upgrades to the existing wastewater reclamation facility in the City of Sedona. The existing aeration system was upgraded and expanded to handle increased flows, including new aeration system, FRP baffles, new mixers and new return pumps. The existing solids handling building

Sedona, AZ, Wastewater Reclamation Plant Upgrades Read More »

A construction site in Phoenix, AZ with large blue pipes laid out along a dug trench for the CAP Dual Waterlines project, featuring excavation machinery and hills in the background.

Phoenix, AZ, CAP Dual Waterlines to Headquarters

Key Info Central Arizona Project Project Details Delivery Method Design-Bid-Build This project included the repair and upgrades to the existing water system and booster stations at Camp Pendleton. Included were the complete replacement of 2 booster pump stations, building upgrades, demolition of an existing redwood water storage tank and new electrical and controls upgrades for both

Phoenix, AZ, CAP Dual Waterlines to Headquarters Read More »

Industrial water pumping station at Camp Pendleton with large blue pipes and electric motors mounted on concrete bases in a utility room.

Camp Pendleton, CA, Area 33 Water System Improvements

Key Info NAVFAC Project Details Delivery Method Design-BuildThis project included the repair and upgrades to the existing water system and booster stations at Camp Pendleton. Included were the complete replacement of 2 booster pump stations, building upgrades, demolition of an existing redwood water storage tank and new electrical and controls upgrades for both sites. The project

Camp Pendleton, CA, Area 33 Water System Improvements Read More »