Water

Equipment cabinets, piping, and a covered opening on a concrete pad protected by yellow bollards.

Phoenix, AZ, Lift Station 73 Biofilter Odor Control Upgrades

Key Info City of Phoenix Project Details Delivery Method Job Order Contract  This project upgraded Lift Station 73 under KEAR’s contract with the City of Phoenix. Work included removal of the existing shade canopy, odor control system, safety station and associated piping. New installations included a biofilter odor control system with structural supports, media and

Phoenix, AZ, Lift Station 73 Biofilter Odor Control Upgrades Read More »

A four-blade mixer impeller attached to a vertical shaft inside a tank.

Flagstaff, AZ, Rio de Flag Wastewater Treatment Plant Anoxic Mixer Replacement

Key Info City of Flagstaff Project Details Delivery Method Job Order Contract  This JOC project included the demolition and replacement of anoxic mixers at the Rio de Flag Water Reclamation Facility. Work also included associated electrical upgrades, including VFD cabinets, conduit and wiring, while utilizing existing infrastructure where feasible.  

Flagstaff, AZ, Rio de Flag Wastewater Treatment Plant Anoxic Mixer Replacement Read More »

Entrance sign of Kartchner Caverns State Park with a mountain backdrop under a clear blue sky.

Kartchner Caverns, AZ, Water Treatment Plant & Water System Upgrade

Key Info Arizona Department of Administration Project Details Delivery Method Construction Manager at Risk   This CMAR project consisted of two phases. Phase 1 included the installation of a new Bioclere package Water Treatment Plant, refurbishment and reuse of existing concrete tanks, existing lift station upgrades and new piping & electrical systems. Also included in

Kartchner Caverns, AZ, Water Treatment Plant & Water System Upgrade Read More »

Industrial boiler room with large pipes, valves, and control panels on concrete walls in Sedona, AZ.

Sedona, AZ, Major Lift Station

Key Info City of Sedona Project Details Delivery Method Construction Manager at RiskKEAR was selected as the Construction Manager at Risk (CMAR) for the design and construction phase services for the major lift stations upgrades project. For the design phase of the project KEAR provided design phase cost budgeting, constructability reviews, value engineering and site investigations.

Sedona, AZ, Major Lift Station Read More »

Industrial water treatment facility with large pipes and tanks, equipped with ladders and railing under a clear sky.

Cannon Air Force Base, Clovis, NM, ADAL Wastewater Treatment Plant Expansion

Key Info US Army Corps of Engineers Albuquerque District Project Details Delivery Method Design-Bid-Build KEAR was proud to provide construction services on the ADAL WWTP Expansion project at Cannon Air Force Base in Clovis, New Mexico. The project was designed by CH2MHill and administered by the Albuquerque District of the US Army Corps of Engineers. The

Cannon Air Force Base, Clovis, NM, ADAL Wastewater Treatment Plant Expansion Read More »

Industrial water treatment facility in Lake Havasu City with large pink pipes and steel structures under a clear blue sky.

Lake Havasu City, AZ, Mulberry WWTP Tertiary Filter Capacity Increase

Key Info Lake Havasu City Project Details Delivery Method Design-BuildKEAR provided complete design-build services to upgrade 2 existing tertiary filters and add another to the existing filter train at the Lake Havasu Mulberry WWTP. The project included the relocation of two existing Schreiber Fuzzy Filters to allow for the installation of a third new filter

Lake Havasu City, AZ, Mulberry WWTP Tertiary Filter Capacity Increase Read More »

A construction site with a crane near large storage tanks in Prescott Valley, workers on site, and various construction vehicles and equipment.

Prescott Valley, AZ, Mingus West Offsite Water System

Key Info Dorn Homes Project Details Delivery Method Design-Bid-Build This project included the construction of a new pump house, 3000 lf of 10 inch water distribution pipeline, 2 new 175,000 gallon water storage tanks including new electrical service and all associated process controls. The project provides water service to several new housing developments nearby being constructed

Prescott Valley, AZ, Mingus West Offsite Water System Read More »

Large green industrial water tank with a level gauge and a smaller attached cylinder, situated in a fenced area with a clear blue sky, maintained by the City of Flagstaff.

Flagstaff, AZ, Continental Well

Key Info City of Flagstaff Project Details Delivery Method Job Order Contract As part of KEAR’s JOC with the City of Flagstaff for Water Facility Construction, this project involved the construction of a 21,000-gallon water storage tank, demolition and replacement of pipe, pumps and equipment inside the existing pump house, distribution piping, retaining wall construction and

Flagstaff, AZ, Continental Well Read More »