Water

Entrance sign of Kartchner Caverns State Park with a mountain backdrop under a clear blue sky.

Kartchner Caverns, AZ, Water Treatment Plant & Water System Upgrade

Key Info Arizona Department of Administration Project Details Delivery Method Construction Manager at Risk   This CMAR project consisted of two phases. Phase 1 included the installation of a new Bioclere package Water Treatment Plant, refurbishment and reuse of existing concrete tanks, existing lift station upgrades and new piping & electrical systems. Also included in […]

Kartchner Caverns, AZ, Water Treatment Plant & Water System Upgrade Read More »

Industrial boiler room with large pipes, valves, and control panels on concrete walls in Sedona, AZ.

Sedona, AZ, Major Lift Station

Key Info City of Sedona Project Details Delivery Method Construction Manager at RiskKEAR was selected as the Construction Manager at Risk (CMAR) for the design and construction phase services for the major lift stations upgrades project. For the design phase of the project KEAR provided design phase cost budgeting, constructability reviews, value engineering and site investigations.

Sedona, AZ, Major Lift Station Read More »

Industrial water treatment facility with large pipes and tanks, equipped with ladders and railing under a clear sky.

Cannon Air Force Base, Clovis, NM, ADAL Wastewater Treatment Plant Expansion

Key Info US Army Corps of Engineers Albuquerque District Project Details Delivery Method Design-Bid-Build KEAR was proud to provide construction services on the ADAL WWTP Expansion project at Cannon Air Force Base in Clovis, New Mexico. The project was designed by CH2MHill and administered by the Albuquerque District of the US Army Corps of Engineers. The

Cannon Air Force Base, Clovis, NM, ADAL Wastewater Treatment Plant Expansion Read More »

Industrial water treatment facility in Lake Havasu City with large pink pipes and steel structures under a clear blue sky.

Lake Havasu City, AZ, Mulberry WWTP Tertiary Filter Capacity Increase

Key Info Lake Havasu City Project Details Delivery Method Design-BuildKEAR provided complete design-build services to upgrade 2 existing tertiary filters and add another to the existing filter train at the Lake Havasu Mulberry WWTP. The project included the relocation of two existing Schreiber Fuzzy Filters to allow for the installation of a third new filter

Lake Havasu City, AZ, Mulberry WWTP Tertiary Filter Capacity Increase Read More »

A construction site with a crane near large storage tanks in Prescott Valley, workers on site, and various construction vehicles and equipment.

Prescott Valley, AZ, Mingus West Offsite Water System

Key Info Dorn Homes Project Details Delivery Method Design-Bid-Build This project included the construction of a new pump house, 3000 lf of 10 inch water distribution pipeline, 2 new 175,000 gallon water storage tanks including new electrical service and all associated process controls. The project provides water service to several new housing developments nearby being constructed

Prescott Valley, AZ, Mingus West Offsite Water System Read More »

Large green industrial water tank with a level gauge and a smaller attached cylinder, situated in a fenced area with a clear blue sky, maintained by the City of Flagstaff.

Flagstaff, AZ, Continental Well

Key Info City of Flagstaff Project Details Delivery Method Job Order Contract As part of KEAR’s JOC with the City of Flagstaff for Water Facility Construction, this project involved the construction of a 21,000-gallon water storage tank, demolition and replacement of pipe, pumps and equipment inside the existing pump house, distribution piping, retaining wall construction and

Flagstaff, AZ, Continental Well Read More »

An industrial site featuring pipelines and a pump station, with various machinery on concrete bases, under a clear sky and distant mountains in the background.

Goodyear, AZ, Rainbow Valley 5MG Reservoir & Pump Station

Key Info City of Goodyear Project Details Delivery Method Design-Build As a subcontractor for MA Mortenson, KEAR provided mechanical construction services for the 5MG reservoir and pump station in Goodyear, Arizona. This project includes the installation, startup and testing of a new vertical turbine pump station and all related suction and discharge piping. Also included in

Goodyear, AZ, Rainbow Valley 5MG Reservoir & Pump Station Read More »

Two construction vehicles, a bulldozer and a compactor operated by the U.S. Army Corps of Engineers, working on dirt mounds in a large open field under a clear sky.

USACE Eunice, NM, Wastewater Treatment Plant Improvements

Key Info U.S. Army Corps of Engineers & City of Eunice Project Details Delivery Method Design-Bid-Build KEAR provided prime contractor construction services on the Eunice Wastewater Treatment Plant Improvements Project in Eunice, New Mexico. This project was part of the American Recovery and Reinvestment Act (ARRA) and was administered by the Albuquerque District of the US

USACE Eunice, NM, Wastewater Treatment Plant Improvements Read More »

Industrial pump room with blue and red pipes, valves, and meters in a concrete building at Naval Base Point Loma.

Naval Base Point Loma San Diego, CA, Upgrade Pump Station A42

Key Info Department of the Navy – Naval Facilities Engineering Command (NAVFAC) Southwest Project Details Delivery Method Design-BuildKEAR was contracted by NAVFAC Southwest to provide complete design-build services for upgrades to the existing Pump Station A42 at Naval Base Point Loma, San Diego, CA. As the design-build prime contractor, KEAR managed the pre-construction phase including all

Naval Base Point Loma San Diego, CA, Upgrade Pump Station A42 Read More »