Bulk Fuel Storage

Excavator loading soil into a dump truck at an airport construction site.

Raleigh-Durham International Airport, NC, Concourse A Hydrant Fuels

Raleigh-Durham International Airport, NC, Concourse A Hydrant Fuels Key Info Raleigh-Durham International Project Details Delivery Method Design-Bid-Build  KEAR completed Raleigh-Durham Concourse A fuel upgrades and expansion at Raleigh-Durham International Airport. The project included installation of a glycol loading system, fleet fuel storage and dispensing systems, electrical and controls integration, and a cathodic protection system. KEAR

Raleigh-Durham International Airport, NC, Concourse A Hydrant Fuels Read More »

A crane is rigged to a horizontal storage tank on a flatbed trailer as workers stand nearby.

Albuquerque International Sunport, NM, Fuel Farm

Key Info Albuquerque, NM Bulk Fuel Cutter Aviation Project Details Delivery Method Design-Build  KEAR constructed the Albuquerque Sunport fuel farm at Albuquerque International Sunport. The fuel storage facility included three 30,000-gallon Jet A aboveground storage tanks, one 12,000-gallon AVGAS aboveground storage tank, one 1,000-gallon unleaded/diesel split aboveground storage tank, one AVGAS loading and unloading skid,

Albuquerque International Sunport, NM, Fuel Farm Read More »

Aboveground piping runs alongside large storage tanks within a fenced facility.

Baltimore/Washington International Thurgood Marshall Airport, MD, Fuel Farm

Baltimore/Washington International Thurgood Marshall Airport, MD, Fuel Farm Key Info Baltimore MD Bulk Fuel M.W. Schlosser Project Details Delivery Method Design-Bid-Build  KEAR served as the subcontractor for the BWI Airport fuel farm system installation at Baltimore/Washington International Thurgood Marshall Airport. The project included installation of all fuel piping, fittings, valves, control valves, gauges, vents, drains,

Baltimore/Washington International Thurgood Marshall Airport, MD, Fuel Farm Read More »

A row of vessels and piping alongside an elevated walkway, with large storage tanks and building in the background.

Raleigh-Durham International Airport, NC, Bulk Fuel Storage

Raleigh-Durham International Airport, NC, Bulk Fuel Storage Key Info Raleigh-Durham International Project Details Delivery Method Design-Bid-Build   KEAR completed Raleigh-Durham Airport bulk fuel storage improvements, including repairs, upgrades and new construction throughout the airport’s fuel distribution system. Work included improvements to the jet fuel storage and hydrant pump system, control building, Type I glycol system,

Raleigh-Durham International Airport, NC, Bulk Fuel Storage Read More »

A picture of Sky Harbor's JET A fuel storage tank's piping.

Sky Harbor International Airport, AZ, 30 MLB Tank Addition

Key Info Sky Harbor International Airport Project Details Delivery Method Design-Build  KEAR provided mechanical construction services for the Sky Harbor fuel storage tank addition at Phoenix Sky Harbor International Airport. The project included an aboveground fuel storage tank and associated fuel, AFFF fire protection and storm-drain piping. KEAR’s scope also included valves and motor operators,

Sky Harbor International Airport, AZ, 30 MLB Tank Addition Read More »

a picture of bulk fuel storage tanks.

South Florida International Airport, FL, Tank Farm Pipe Replacement

Key Info USACE, South Florida International Airport Project Details Delivery Method Design-Build  KEAR provided complete civil and mechanical construction services for new work on the existing fuel tank farm at Southwest Florida International Airport in Ft Myers, Florida. The project involved 2 phases of work– civil and mechanical. The civil phase included the installation of

South Florida International Airport, FL, Tank Farm Pipe Replacement Read More »

A picture of a bulk fuel storage tank.

USACE, Marine Corps Air Station Yuma, AZ, Fuel Repairs III

Key Info USACE, MCAS Yuma Project Details Delivery Method Design-Build  As the design-build prime contractor, KEAR was contracted by the USACE Omaha District to perform various fuel system upgrades and to construct a new crew building at MCAS Yuma, AZ. As part of the project, KEAR repaired the existing fillstands, replaced various fuel system components,

USACE, Marine Corps Air Station Yuma, AZ, Fuel Repairs III Read More »