General Aviation

Temporary storage tanks and connected piping on an airport apron near terminal gates.

Sky Harbor International Airport, AZ, Terminal 3 South Hydrant Fuel System

Key Info Sky Harbor International Airport Project Details Delivery Method Construction Manager at Risk  KEAR provided construction services for the Phoenix Sky Harbor Terminal 3 fuel system serving the new 12-gate South Concourse. The work included approximately 3,700 linear feet of fuel piping, 15 hydrant pits and four isolation valve vaults.

Sky Harbor International Airport, AZ, Terminal 3 South Hydrant Fuel System Read More »

KEAR crew using lifting equipment to position a section of pipe at an airport construction site.

Sky Harbor International Airport, AZ, T3N2 Hydrant Fuels

Key Info Sky Harbor International Airport Project Details Delivery Method Design-Bid-Build  KEAR completed hydrant fuel system work for the Terminal 3 North 2 concourse at Phoenix Sky Harbor International Airport, which added six gates. The scope included two isolation valve vaults, main and lateral fuel piping, and six new hydrant fuel pits. KEAR also provided

Sky Harbor International Airport, AZ, T3N2 Hydrant Fuels Read More »

Tanker truck beside a fuel loading station, with storage tanks in the background.

Tucson International Airport, AZ, Airside Fillstand Repairs

Key Info Tucson, AZ Tucson Fuel Facilities, LLC Project Details Delivery Method Design-Bid-Build  KEAR completed Tucson airport fillstand repairs for Tucson Fuel Facilities at Tucson International Airport. The project included demolition, piping modifications and installation of new fueling components, including a load meter, truck loading valve and load computer. The work also included pressure monitoring

Tucson International Airport, AZ, Airside Fillstand Repairs Read More »

A worker in a boom lift works on the exterior of a large storage tank, with a second tank behind it.

Boise Airport, ID, Tank Farm

Boise Airport, ID, Tank Farm Key Info Boise Idaho General Aviation Boise Airport Project Details Delivery Method Design-Bid-Build  KEAR is constructing the Boise Airport tank farm to expand fuel storage capacity and support fueling operations at Boise International Airport. The project features three 10,000-barrel jet fuel storage tanks along with extensive site and utility infrastructure.

Boise Airport, ID, Tank Farm Read More »

A picture of the final fuel farm improvements.

Phoenix-Mesa Gateway Airport, AZ, Fuel Farm Expansion

Key Info Phoenix-Mesa Gateway Airport Authority Project Details Delivery Method Construction Manager at Risk  The Phoenix-Mesa Gateway fuel farm expansion includes three 50,000-gallon aboveground storage tanks and supporting infrastructure. KEAR Civil served as the Construction Manager at Risk (CMAR) for the Phoenix-Mesa Gateway Airport Fuel Farm Expansion, increasing the airport’s jet fuel storage capacity by

Phoenix-Mesa Gateway Airport, AZ, Fuel Farm Expansion Read More »

Fenced airport fuel facility with storage tanks and a fuel truck, with aircraft and red rock mountains in the background.

Sedona Airport, AZ, New Fuel Farm

Key Info Sedona-Oak Creek Airport Authority Project Details Delivery Method Design-Bid-Build  The Sedona Oak Creek Airport Authority contracted KEAR to provide fuel farm upgrades and replacement at Sedona Airport.  The project included two new 15,000-gallon and one new 12,000-gallon double-walled, UL 2085 aboveground storage tanks. KEAR also installed access platforms and stairs, bulk fuel loading

Sedona Airport, AZ, New Fuel Farm Read More »

A crane lifts a waste fuel storage tank above a flatbed truck, with the Las Vegas Strip in the background.

Harry Reid International Airport, NV, West Side Tank

Key Info Harry Reid International Airport Project Details Delivery Method Design-Bid-Build  KEAR completed fuel system modifications that included removing an existing 30,000-gallon mogas tank and a 15,000-gallon waste fuel tank, and converting an existing 30,000-gallon avgas tank to diesel service. The team installed a new owner-supplied, 30,000-gallon, two-compartment tank for avgas and waste fuel, along

Harry Reid International Airport, NV, West Side Tank Read More »

New Jet-A fuel farm with load and unload facilities.

Grant County Airport, NM, Fuel Farm Expansion

Key Info Grant County Airport Authority Project Details Delivery Method Design-Bid-Build  KEAR updated and expanded the fuel storage and distribution system at Grant County Airport. The project included construction of a 12,000 gallon Jet-A fuel tank, fuel truck rack loading/unloading skid, concrete containment pad around the 2 existing tanks, truck fuel loading and unloading containment

Grant County Airport, NM, Fuel Farm Expansion Read More »

Two aboveground fuel storage tanks with dispensing equipment and yellow protective bollards.

San Carlos Apache Tribe, AZ, Fuel Farm

Key Info San Carlos Apache Tribe Project Details Delivery Method Design-Bid-Build The project included installing a new fuel farm, including one 12,000-gallon UL2085 Fireguard Jet Fueling System and one 12,000-gallon UL2085 Fireguard Avgas Fueling system. KEAR installed the new systems on new concrete pads and installed all necessary pumps, valves and electrical components. New primary power

San Carlos Apache Tribe, AZ, Fuel Farm Read More »