Portfolio

Description.

An industrial site featuring pipelines and a pump station, with various machinery on concrete bases, under a clear sky and distant mountains in the background.

Goodyear, AZ, Rainbow Valley 5MG Reservoir & Pump Station

Key Info City of Goodyear Project Details Delivery Method Design-Build As a subcontractor for MA Mortenson, KEAR provided mechanical construction services for the 5MG reservoir and pump station in Goodyear, Arizona. This project includes the installation, startup and testing of a new vertical turbine pump station and all related suction and discharge piping. Also included in […]

Goodyear, AZ, Rainbow Valley 5MG Reservoir & Pump Station Read More »

Two construction vehicles, a bulldozer and a compactor operated by the U.S. Army Corps of Engineers, working on dirt mounds in a large open field under a clear sky.

USACE Eunice, NM, Wastewater Treatment Plant Improvements

Key Info U.S. Army Corps of Engineers & City of Eunice Project Details Delivery Method Design-Bid-Build KEAR provided prime contractor construction services on the Eunice Wastewater Treatment Plant Improvements Project in Eunice, New Mexico. This project was part of the American Recovery and Reinvestment Act (ARRA) and was administered by the Albuquerque District of the US

USACE Eunice, NM, Wastewater Treatment Plant Improvements Read More »

Industrial pump room with blue and red pipes, valves, and meters in a concrete building at Naval Base Point Loma.

Naval Base Point Loma San Diego, CA, Upgrade Pump Station A42

Key Info Department of the Navy – Naval Facilities Engineering Command (NAVFAC) Southwest Project Details Delivery Method Design-BuildKEAR was contracted by NAVFAC Southwest to provide complete design-build services for upgrades to the existing Pump Station A42 at Naval Base Point Loma, San Diego, CA. As the design-build prime contractor, KEAR managed the pre-construction phase including all

Naval Base Point Loma San Diego, CA, Upgrade Pump Station A42 Read More »

An exterior view of a beige stone building at the Lake Mary Water Treatment Plant with an open door, featuring a brown roof and a small window.

Flagstaff, AZ, Lake Mary Water Treatment Plant Chlorine Dioxide Facility

Key Info City of Flagstaff Project Details Delivery Method Design-Bid-Build As the prime contractor, KEAR constructed a new chlorine dioxide facility for the City of Flagstaff at the Lake Mary Water Treatment Plant. The new masonry building addition houses a new chlorine dioxide system for treatment of raw water from Lake Mary. The project included the

Flagstaff, AZ, Lake Mary Water Treatment Plant Chlorine Dioxide Facility Read More »

Industrial shredder machine in a wastewater reclamation plant with a conveyor belt system under a metal roof.

Sedona, AZ, Wastewater Reclamation Plant Upgrades

Key Info City of Sedona Project Details Delivery Method Design-Bid-Build This project consisted of miscellaneous upgrades to the existing wastewater reclamation facility in the City of Sedona. The existing aeration system was upgraded and expanded to handle increased flows, including new aeration system, FRP baffles, new mixers and new return pumps. The existing solids handling building

Sedona, AZ, Wastewater Reclamation Plant Upgrades Read More »

A construction site in Phoenix, AZ with large blue pipes laid out along a dug trench for the CAP Dual Waterlines project, featuring excavation machinery and hills in the background.

Phoenix, AZ, CAP Dual Waterlines to Headquarters

Key Info Central Arizona Project Project Details Delivery Method Design-Bid-Build This project included the repair and upgrades to the existing water system and booster stations at Camp Pendleton. Included were the complete replacement of 2 booster pump stations, building upgrades, demolition of an existing redwood water storage tank and new electrical and controls upgrades for both

Phoenix, AZ, CAP Dual Waterlines to Headquarters Read More »

Scroll to Top