Portfolio

Description.

A picture of Sky Harbor's JET A fuel storage tank's piping.

Sky Harbor International Airport, AZ, 30 MLB Tank Addition

Key Info Sky Harbor International Airport Project Details Delivery Method Design-Build   KEAR provided complete mechanical construction services for the 30MBL tank construction project at Phoenix Sky Harbor. This project involved the new construction of an above ground fuel storage tank and all associated piping. KEAR installed and tested all fuel, fireline and storm-drain piping […]

Sky Harbor International Airport, AZ, 30 MLB Tank Addition Read More »

Entrance sign of Kartchner Caverns State Park with a mountain backdrop under a clear blue sky.

Kartchner Caverns, AZ, Water Treatment Plant & Water System Upgrade

Key Info Arizona Department of Administration Project Details Delivery Method Construction Manager at Risk   This CMAR project consisted of two phases. Phase 1 included the installation of a new Bioclere package Water Treatment Plant, refurbishment and reuse of existing concrete tanks, existing lift station upgrades and new piping & electrical systems. Also included in

Kartchner Caverns, AZ, Water Treatment Plant & Water System Upgrade Read More »

Industrial boiler room with large pipes, valves, and control panels on concrete walls in Sedona, AZ.

Sedona, AZ, Major Lift Station

Key Info City of Sedona Project Details Delivery Method Construction Manager at RiskKEAR was selected as the Construction Manager at Risk (CMAR) for the design and construction phase services for the major lift stations upgrades project. For the design phase of the project KEAR provided design phase cost budgeting, constructability reviews, value engineering and site investigations.

Sedona, AZ, Major Lift Station Read More »

An aerial picture of Sedona Airports new fuel farm.

Sedona Airport, AZ, New Fuel Farm

Key Info Sedona-Oak Creek Airport Authority Project Details Delivery Method Design-Bid-Build  The Sedona Oak Creek Airport Authority contracted KEAR to provide fuel farm upgrade and replacement services at the Sedona Oak Creek Airport. This project included the installation of 2 new 15,000 gallon and 1 new 12,000 gallon double walled above ground storage tanks, new

Sedona Airport, AZ, New Fuel Farm Read More »

Industrial water treatment facility with large pipes and tanks, equipped with ladders and railing under a clear sky.

Cannon Air Force Base, Clovis, NM, ADAL Wastewater Treatment Plant Expansion

Key Info US Army Corps of Engineers Albuquerque District Project Details Delivery Method Design-Bid-Build KEAR was proud to provide construction services on the ADAL WWTP Expansion project at Cannon Air Force Base in Clovis, New Mexico. The project was designed by CH2MHill and administered by the Albuquerque District of the US Army Corps of Engineers. The

Cannon Air Force Base, Clovis, NM, ADAL Wastewater Treatment Plant Expansion Read More »

Aerial view of Salt Lake City International Airport expansion site with active construction, featuring equipment and partially constructed buildings, set against a backdrop of snowy mountains.

Salt Lake City International Airport, UT, Hydrant Fuel System

Key Info Salt Lake City Corporation Project Details Delivery Method Construction Manager at Risk KEAR was the Hydrant Fuel System Contractor for the new South Concourse West at Salt Lake City International Airport (SLC). The system was constructed as part of the SLC Terminal Redevelopment Program which included a complete new hydrant system of the new terminal. The

Salt Lake City International Airport, UT, Hydrant Fuel System Read More »

Industrial water treatment facility in Lake Havasu City with large pink pipes and steel structures under a clear blue sky.

Lake Havasu City, AZ, Mulberry WWTP Tertiary Filter Capacity Increase

Key Info Lake Havasu City Project Details Delivery Method Design-BuildKEAR provided complete design-build services to upgrade 2 existing tertiary filters and add another to the existing filter train at the Lake Havasu Mulberry WWTP. The project included the relocation of two existing Schreiber Fuzzy Filters to allow for the installation of a third new filter

Lake Havasu City, AZ, Mulberry WWTP Tertiary Filter Capacity Increase Read More »