Nashville International Airport, TN, Fuel Facility Modifications
Key Info Nashville International Airport Project Details Delivery Method Design-Build
Nashville International Airport, TN, Fuel Facility Modifications Read More »
Description.
Key Info Nashville International Airport Project Details Delivery Method Design-Build
Nashville International Airport, TN, Fuel Facility Modifications Read More »
Key Info Nashville International Airport Project Details Delivery Method Design-Bid-Build KEAR provided prime contractor services for a major upgrade project to the fuel farm at Nashville International Airport. This project involved various fuel system modifications including the upgrades to 6 bulk fuel storage tanks. The API 650 tank repairs included installation of reinforcing pads, floor patch plates,
Nashville International Airport, TN, Fuel Facility Upgrades Read More »
Key Info Lake Havasu City Project Details Delivery Method Design-Bid-Build The Mulberry and Island WWTP upgrade project involved the expansion of the existing Mulberry WWTP from 1.1 mgd to 2.2 mgd, and aeration upgrades to the existing Island WWTP. To achieve the Mulberry expansion a new clarifier, aeration basin, filtration system, UV disinfection system, blowers,
Lake Havasu City, AZ, Mulberry WWTP Expansion Read More »
Key Info City of Goodyear Project Details Delivery Method Design-Build As a subcontractor for MA Mortenson, KEAR provided mechanical construction services for the 5MG reservoir and pump station in Goodyear, Arizona. This project includes the installation, startup and testing of a new vertical turbine pump station and all related suction and discharge piping. Also included in
Goodyear, AZ, Rainbow Valley 5MG Reservoir & Pump Station Read More »
Key Info U.S. Army Corps of Engineers & City of Eunice Project Details Delivery Method Design-Bid-Build KEAR provided prime contractor construction services on the Eunice Wastewater Treatment Plant Improvements Project in Eunice, New Mexico. This project was part of the American Recovery and Reinvestment Act (ARRA) and was administered by the Albuquerque District of the US
USACE Eunice, NM, Wastewater Treatment Plant Improvements Read More »
Key Info US Army Corps of Engineers Albuquerque District Project Details Delivery Method Design-Bid-Build KEAR was proud to provide construction services on the ADAL WWTP Expansion project at Cannon Air Force Base in Clovis, New Mexico. The project was designed by CH2MHill and administered by the Albuquerque District of the US Army Corps of Engineers. The
Cannon Air Force Base, Clovis, NM, ADAL Wastewater Treatment Plant Expansion Read More »
Key Info Department of the Navy – Naval Facilities Engineering Command (NAVFAC) Southwest Project Details Delivery Method Design-BuildKEAR was contracted by NAVFAC Southwest to provide complete design-build services for upgrades to the existing Pump Station A42 at Naval Base Point Loma, San Diego, CA. As the design-build prime contractor, KEAR managed the pre-construction phase including all
Naval Base Point Loma San Diego, CA, Upgrade Pump Station A42 Read More »
Key Info City of Torrance Project Details Delivery Method Design-Bid-Build KEAR provided prime contractor construction services on the Sodium Fluoride Feed system project for the City of Torrance, California. The project was located at two separate locations within the City of Torrance; The Robert W. Goldsworthy Desalter facility, and Well No. 9. KEAR installed skid mounted
Torrance, CA, Sodium Fluoride Feed Station Read More »
Key Info City of Flagstaff Project Details Delivery Method Design-Bid-Build As the prime contractor, KEAR constructed a new chlorine dioxide facility for the City of Flagstaff at the Lake Mary Water Treatment Plant. The new masonry building addition houses a new chlorine dioxide system for treatment of raw water from Lake Mary. The project included the
Flagstaff, AZ, Lake Mary Water Treatment Plant Chlorine Dioxide Facility Read More »
Key Info City of Sedona Project Details Delivery Method Design-Bid-Build This project consisted of miscellaneous upgrades to the existing wastewater reclamation facility in the City of Sedona. The existing aeration system was upgraded and expanded to handle increased flows, including new aeration system, FRP baffles, new mixers and new return pumps. The existing solids handling building
Sedona, AZ, Wastewater Reclamation Plant Upgrades Read More »