A construction site with a crane near large storage tanks in Prescott Valley, workers on site, and various construction vehicles and equipment.

Prescott Valley, AZ, Mingus West Offsite Water System

Key Info Dorn Homes Project Details Delivery Method Design-Bid-Build This project included the construction of a new pump house, 3000 lf of 10 inch water distribution pipeline, 2 new 175,000 gallon water storage tanks including new electrical service and all associated process controls. The project provides water service to several new housing developments nearby being constructed […]

Prescott Valley, AZ, Mingus West Offsite Water System Read More »

Large green industrial water tank with a level gauge and a smaller attached cylinder, situated in a fenced area with a clear blue sky, maintained by the City of Flagstaff.

Flagstaff, AZ, Continental Well

Key Info City of Flagstaff Project Details Delivery Method Job Order Contract As part of KEAR’s JOC with the City of Flagstaff for Water Facility Construction, this project involved the construction of a 21,000-gallon water storage tank, demolition and replacement of pipe, pumps and equipment inside the existing pump house, distribution piping, retaining wall construction and

Flagstaff, AZ, Continental Well Read More »

A picture of fuel system storage vaults.

City of Mesa 6th Street Service Center, AZ, Ground Fuel Vault Repairs

Key Info 6th Street Service Center Project Details Delivery Method Design-Bid-Build  KEAR’s scope of work entailed repair and resealing ground fuel vaults for a diesel tank and 2 gasoline tanks, replacing sumps, installation of new concrete slabs and pavement. Modified existing chain link fencing while maintaining site security. Provided Class 1 Division 2 electrical connections for

City of Mesa 6th Street Service Center, AZ, Ground Fuel Vault Repairs Read More »

A picture of ADOT's ground fuel storage tank being hoisted into place.

ADOT Quartzsite Maintence Office, AZ, Ground Fuel Facility Improvements

Key Info Arizona Department of Transportation Project Details Delivery Method Design-Bid-Build  KEAR provided fuel system construction services to ADOT’s fleet facility in Quartzsite, AZ. The project included installation of a double-wall, above ground storage tank and tank pad, a new unleaded 12,000 gallon secondary containment above ground steel storage tank and piping to the remote

ADOT Quartzsite Maintence Office, AZ, Ground Fuel Facility Improvements Read More »

A picture of Havasu Landing's ground fuel dispensers.

Havasu Landing Resort, CA, Ground Fuel Facility Improvements

Key Info Havasu Landing Resort & Casino Project Details Delivery Method Design-Build  KEAR provided fueling station design-build construction services for the Havasu Landing Resort and Chemehuevi Indian Tribe. As a design-build project, KEAR’s project team provided complete design and construction services for the installation of 3 new above-ground fuel storage tanks. These tanks included three

Havasu Landing Resort, CA, Ground Fuel Facility Improvements Read More »

New Jet-A fuel farm with load and unload facilities.

Grant County Airport, NM, Fuel Farm Expansion

Key Info Grant County Airport Authority Project Details Delivery Method Design-Bid-Build  KEAR updated and expanded the fuel storage and distribution system at Grant County Airport. The project included construction of a 12,000 gallon Jet-A fuel tank, fuel truck rack loading/unloading skid, concrete containment pad around the 2 existing tanks, truck fuel loading and unloading containment

Grant County Airport, NM, Fuel Farm Expansion Read More »

a picture of bulk fuel storage tanks.

South Florida International Airport, FL, Tank Farm Pipe Replacement

Key Info USACE, South Florida International Airport Project Details Delivery Method Design-Build  KEAR provided complete civil and mechanical construction services for new work on the existing fuel tank farm at Southwest Florida International Airport in Ft Myers, Florida. The project involved 2 phases of work– civil and mechanical. The civil phase included the installation of

South Florida International Airport, FL, Tank Farm Pipe Replacement Read More »

A picture of a bulk fuel storage tank.

USACE, Marine Corps Air Station Yuma, AZ, Fuel Repairs III

Key Info USACE, MCAS Yuma Project Details Delivery Method Design-Build  As the design-build prime contractor, KEAR was contracted by the USACE Omaha District to perform various fuel system upgrades and to construct a new crew building at MCAS Yuma, AZ. As part of the project, KEAR repaired the existing fillstands, replaced various fuel system components,

USACE, Marine Corps Air Station Yuma, AZ, Fuel Repairs III Read More »