Portfolio

Description.

A picture of fuel hydrant workat Oakland International Airport.

Oakland International Airport, CA, Southwest Airlines Parking Fuels

Key Info Oakland International Airport Project Details Delivery Method Design-Bid-Build  KEAR provided fuel construction services for the relocation and movement of various models of JBT passenger boarding bridges at Oakland International Airport. The work included the demolition of 7 concrete panels, abandonment of existing pits, installation of seven new pits, along with associated piping and

Oakland International Airport, CA, Southwest Airlines Parking Fuels Read More »

A picture of the New Hampshire Army National Guard's hangars.

Army Aviation Support Facility, NH, Concord Fueling System

Key Info New Hampshire Army National Guard Project Details Delivery Method Design-Build  KEAR provided fuel construction services for extensive modifications to the existing fueling system at AASF, Concord. The scope of work included demoing and removing the existing underground fuel piping and performing subsurface investigations with NHDEP to verify if any contamination was present. Once

Army Aviation Support Facility, NH, Concord Fueling System Read More »

A picture of Sky Harbor International Airport's Terminal 2 fuel project with the Sky Train's elevated guideway in the the background.

Sky Harbor International Airport, AZ, Terminal 2 Building Demolition Fuels

Key Info Sky Harbor International Airport Project Details Delivery Method Construction Manager at Risk  As part of the demolition of the old Terminal 2 at Phoenix Sky Harbor, KEAR provided complete removal and capping of the existing fuel hydrant system on both the east and west sides. The removal of the line was necessary for

Sky Harbor International Airport, AZ, Terminal 2 Building Demolition Fuels Read More »

A picture of fuel piping at Tucson International Airport's fuel improvment project.

Tucson International Airport, AZ, Main Terminal Apron Reconstruction

Key Info Tucson International Airport Project Details Delivery Method Design-Bid-Build   KEAR performed design and construction phase services on this CMAR project which included 18 new hydrant pits, 4,300 LF of hydrant fuel system pipe replacement, isolation valve vaults, transmission main pipeline, 2 new loading racks and new isolation valve vaults. KEAR provided all fuel

Tucson International Airport, AZ, Main Terminal Apron Reconstruction Read More »

A picture of the New Hampshire Army National Guard's fuel dispensers under construction.

Nashville International Airport, TN, Fuel Facility Modifications

Key Info Nashville International Airport Project Details Delivery Method Design-Build  KEAR provided aviation fuel construction services for the modification of the Fuel Facility at Nashville International Airport. The facility modifications included the phased construction on 6 existing API 650 aboveground Jet-A fuel storage tanks as well as the hydrant pit drainage system. The AST modifications

Nashville International Airport, TN, Fuel Facility Modifications Read More »

A picture of Nashville Airport's new bulk storage facility with scaffolding in place.

Nashville International Airport, TN, Fuel Facility Upgrades

Key Info Nashville International Airport Project Details Delivery Method Design-Bid-Build  KEAR provided prime contractor services for a major upgrade project to the fuel farm at Nashville International Airport. This project involved various fuel system modifications including the upgrades to 6 bulk fuel storage tanks. The API 650 tank repairs included installation of reinforcing pads, floor patch plates,

Nashville International Airport, TN, Fuel Facility Upgrades Read More »