Fuel

A picture of Sky Harbor's JET A fuel storage tank's piping.

Sky Harbor International Airport, AZ, 30 MLB Tank Addition

Key Info Sky Harbor International Airport Project Details Delivery Method Design-Build   KEAR provided complete mechanical construction services for the 30MBL tank construction project at Phoenix Sky Harbor. This project involved the new construction of an above ground fuel storage tank and all associated piping. KEAR installed and tested all fuel, fireline and storm-drain piping […]

Sky Harbor International Airport, AZ, 30 MLB Tank Addition Read More »

An aerial picture of Sedona Airports new fuel farm.

Sedona Airport, AZ, New Fuel Farm

Key Info Sedona-Oak Creek Airport Authority Project Details Delivery Method Design-Bid-Build  The Sedona Oak Creek Airport Authority contracted KEAR to provide fuel farm upgrade and replacement services at the Sedona Oak Creek Airport. This project included the installation of 2 new 15,000 gallon and 1 new 12,000 gallon double walled above ground storage tanks, new

Sedona Airport, AZ, New Fuel Farm Read More »

Aerial view of Salt Lake City International Airport expansion site with active construction, featuring equipment and partially constructed buildings, set against a backdrop of snowy mountains.

Salt Lake City International Airport, UT, Hydrant Fuel System

Key Info Salt Lake City Corporation Project Details Delivery Method Construction Manager at Risk KEAR was the Hydrant Fuel System Contractor for the new South Concourse West at Salt Lake City International Airport (SLC). The system was constructed as part of the SLC Terminal Redevelopment Program which included a complete new hydrant system of the new terminal. The

Salt Lake City International Airport, UT, Hydrant Fuel System Read More »

A picture of fuel system storage vaults.

City of Mesa 6th Street Service Center, AZ, Ground Fuel Vault Repairs

Key Info 6th Street Service Center Project Details Delivery Method Design-Bid-Build  KEAR’s scope of work entailed repair and resealing ground fuel vaults for a diesel tank and 2 gasoline tanks, replacing sumps, installation of new concrete slabs and pavement. Modified existing chain link fencing while maintaining site security. Provided Class 1 Division 2 electrical connections for

City of Mesa 6th Street Service Center, AZ, Ground Fuel Vault Repairs Read More »

A picture of ADOT's ground fuel storage tank being hoisted into place.

ADOT Quartzsite Maintence Office, AZ, Ground Fuel Facility Improvements

Key Info Arizona Department of Transportation Project Details Delivery Method Design-Bid-Build  KEAR provided fuel system construction services to ADOT’s fleet facility in Quartzsite, AZ. The project included installation of a double-wall, above ground storage tank and tank pad, a new unleaded 12,000 gallon secondary containment above ground steel storage tank and piping to the remote

ADOT Quartzsite Maintence Office, AZ, Ground Fuel Facility Improvements Read More »

A picture of Havasu Landing's ground fuel dispensers.

Havasu Landing Resort, CA, Ground Fuel Facility Improvements

Key Info Havasu Landing Resort & Casino Project Details Delivery Method Design-Build  KEAR provided fueling station design-build construction services for the Havasu Landing Resort and Chemehuevi Indian Tribe. As a design-build project, KEAR’s project team provided complete design and construction services for the installation of 3 new above-ground fuel storage tanks. These tanks included three

Havasu Landing Resort, CA, Ground Fuel Facility Improvements Read More »

Scroll to Top