Hydrant Fuel System

A tanker trailer parked in front of vertical storage tanks at an airport facility.

Nashville International Airport, TN, Concourse D Extension

Key Info Nashville, TN Hydrant Fuel Hensel Phelps Project Details Delivery Method Design-Bid-Build/Construction Manager at Risk  KEAR served as the subcontractor for the Nashville Concourse D hydrant fuel system installation at Nashville International Airport. The project included all fueling system work required to provide a complete and operational aircraft fueling system. Work included installation of

Nashville International Airport, TN, Concourse D Extension Read More »

Piping and equipment staged on an airport apron near the terminal and control tower.

Salt Lake City International Airport, UT, Hydrant Fuel System

Key Info Salt Lake City Corporation Project Details Delivery Method Construction Manager at Risk KEAR was the hydrant fuel system contractor for South Concourse West at Salt Lake City International Airport. The system was constructed as part of the SLC Terminal Redevelopment Program which included a complete new hydrant system of the new terminal. The project

Salt Lake City International Airport, UT, Hydrant Fuel System Read More »

A picture of fuel hydrant workat Oakland International Airport.

Oakland International Airport, CA, Southwest Airlines Parking Fuels

Key Info Oakland International Airport Project Details Delivery Method Design-Bid-Build  KEAR provided fuel construction services in support of passenger boarding bridge relocations at Oakland International Airport. The project included demolition of seven concrete panels, abandonment of existing hydrant pits, and installation of seven new pits with associated fuel piping and replacement concrete panels. KEAR completed

Oakland International Airport, CA, Southwest Airlines Parking Fuels Read More »

A picture of the New Hampshire Army National Guard's hangars.

Army Aviation Support Facility, NH, Concord Fueling System

Key Info New Hampshire Army National Guard Project Details Delivery Method Design-Build  KEAR provided fuel construction services for extensive modifications to the existing fueling system at AASF, Concord. The scope of work included demoing and removing the existing underground fuel piping and performing subsurface investigations with NHDEP to verify if any contamination was present. Once

Army Aviation Support Facility, NH, Concord Fueling System Read More »

A picture of Sky Harbor International Airport's Terminal 2 fuel project with the Sky Train's elevated guideway in the the background.

Sky Harbor International Airport, AZ, Terminal 2 Building Demolition Fuels

Key Info Sky Harbor International Airport Project Details Delivery Method Construction Manager at Risk  As part of the demolition of the old Terminal 2 at Phoenix Sky Harbor, KEAR provided complete removal and capping of the existing fuel hydrant system on both the east and west sides. The removal of the line was necessary for

Sky Harbor International Airport, AZ, Terminal 2 Building Demolition Fuels Read More »

A picture of fuel piping at Tucson International Airport's fuel improvment project.

Tucson International Airport, AZ, Main Terminal Apron Reconstruction

Key Info Tucson International Airport Project Details Delivery Method Construction Manager at Risk   KEAR provided design and construction phase services for this CMAR project at Tucson International Airport. The project included the installation of 18 new hydrant pits, replacement of 4,300 LF of hydrant fuel system piping and the transmission main pipeline, construction of

Tucson International Airport, AZ, Main Terminal Apron Reconstruction Read More »

Workers in high-vis vests inspecting hydrant fuel pits parts laid out on the ground next to a white tanker truck under a clear sky at Phoenix Terminal 3.

Sky Harbor International Airport, AZ, Terminal 3 Reconstruction Hydrant Fuel Pits

Key Info City of Phoenix Project Details Delivery Method Construction Manager at Risk As a subcontractor to Kiewit Infrastructure West Co, KEAR provided aviation fueling system demolition and installation services as part of the T3 North Apron Reconstruction Project at Phoenix Sky Harbor International Airport. The overall project involved removing and replacing the existing concrete

Sky Harbor International Airport, AZ, Terminal 3 Reconstruction Hydrant Fuel Pits Read More »

Aerial view of the ongoing Concourse Modernization at Memphis International Airport, featuring buildings under construction and heavy machinery scattered around.

Memphis International Airport, TN, Concourse Modernization Hydrant Fuel System

Key Info Memphis-Shelby County Airport Authority Project Details Delivery Method Design-Build KEAR was selected as the hydrant fuel system contractor for the Concourse Modernization project at Memphis International Airport. The fuel system modifications were completed simultaneously with concourse upgrades which consisted of placing 25 passenger boarding bridges (PBBs) into a final configuration on the modernized Concourse

Memphis International Airport, TN, Concourse Modernization Hydrant Fuel System Read More »

Industrial site with pipeline valves and meters on a clear day, featuring a large storage tank and a fuel offload island in the background.

San Diego International Airport, CA, Fuel Offload Island and System Upgrades

Key Info Allied Aviation of San Diego Project Details Delivery Method Design-Bid-BuildKEAR was contracted to construct the new improvements to the jet fuel delivery system at the San Diego International Airport. A previous study identified the need for two additional refueler loading islands. The project involved various upgrades to the existing fuel load islands including

San Diego International Airport, CA, Fuel Offload Island and System Upgrades Read More »

Construction barriers and cones at an airport tarmac with ground service vehicles and airplanes visible in the background near Hydrant Fuel Pits under a clear blue sky.

Los Angeles International Airport, CA, Terminal 4 Gate Enhancement Hydrant Fuel Pits

Key Info American Airlines Project Details Delivery Method Design-Bid-BuildKEAR was contracted to complete hydrant fuel pit modifications for the Terminal 4 (T4) Gate Enhancement Project at Los Angeles International Airport. The project included the installation of new hydrant pits and associated lateral piping to facilitate revised aircraft parking configurations. KEAR executed all aspects of the

Los Angeles International Airport, CA, Terminal 4 Gate Enhancement Hydrant Fuel Pits Read More »