Hydrant Fuel System

Aerial view of Salt Lake City International Airport expansion site with active construction, featuring equipment and partially constructed buildings, set against a backdrop of snowy mountains.

Salt Lake City International Airport, UT, Hydrant Fuel System

Key Info Salt Lake City Corporation Project Details Delivery Method Construction Manager at Risk KEAR was the Hydrant Fuel System Contractor for the new South Concourse West at Salt Lake City International Airport (SLC). The system was constructed as part of the SLC Terminal Redevelopment Program which included a complete new hydrant system of the new terminal. The […]

Salt Lake City International Airport, UT, Hydrant Fuel System Read More »

A picture of fuel hydrant workat Oakland International Airport.

Oakland International Airport, CA, Southwest Airlines Parking Fuels

Key Info Oakland International Airport Project Details Delivery Method Design-Bid-Build  KEAR provided fuel construction services for the relocation and movement of various models of JBT passenger boarding bridges at Oakland International Airport. The work included the demolition of 7 concrete panels, abandonment of existing pits, installation of seven new pits, along with associated piping and

Oakland International Airport, CA, Southwest Airlines Parking Fuels Read More »

A picture of the New Hampshire Army National Guard's hangars.

Army Aviation Support Facility, NH, Concord Fueling System

Key Info New Hampshire Army National Guard Project Details Delivery Method Design-Build  KEAR provided fuel construction services for extensive modifications to the existing fueling system at AASF, Concord. The scope of work included demoing and removing the existing underground fuel piping and performing subsurface investigations with NHDEP to verify if any contamination was present. Once

Army Aviation Support Facility, NH, Concord Fueling System Read More »

A picture of Sky Harbor International Airport's Terminal 2 fuel project with the Sky Train's elevated guideway in the the background.

Sky Harbor International Airport, AZ, Terminal 2 Building Demolition Fuels

Key Info Sky Harbor International Airport Project Details Delivery Method Construction Manager at Risk  As part of the demolition of the old Terminal 2 at Phoenix Sky Harbor, KEAR provided complete removal and capping of the existing fuel hydrant system on both the east and west sides. The removal of the line was necessary for

Sky Harbor International Airport, AZ, Terminal 2 Building Demolition Fuels Read More »

A picture of fuel piping at Tucson International Airport's fuel improvment project.

Tucson International Airport, AZ, Main Terminal Apron Reconstruction

Key Info Tucson International Airport Project Details Delivery Method Design-Bid-Build   KEAR performed design and construction phase services on this CMAR project which included 18 new hydrant pits, 4,300 LF of hydrant fuel system pipe replacement, isolation valve vaults, transmission main pipeline, 2 new loading racks and new isolation valve vaults. KEAR provided all fuel

Tucson International Airport, AZ, Main Terminal Apron Reconstruction Read More »

Workers in high-vis vests inspecting hydrant fuel pits parts laid out on the ground next to a white tanker truck under a clear sky at Phoenix Terminal 3.

Sky Harbor International Airport, AZ, Terminal 3 Reconstruction Hydrant Fuel Pits

Key Info City of Phoenix Project Details Delivery Method Construction Manager at Risk As a subcontractor to Kiewit Infrastructure West Co, KEAR provided aviation fueling system demolition and installation services as part of the T3 North Apron Reconstruction Project at Phoenix Sky Harbor International Airport. The overall project involved removing and replacing the existing concrete

Sky Harbor International Airport, AZ, Terminal 3 Reconstruction Hydrant Fuel Pits Read More »

Aerial view of the ongoing Concourse Modernization at Memphis International Airport, featuring buildings under construction and heavy machinery scattered around.

Memphis International Airport, TN, Concourse Modernization Hydrant Fuel System

Key Info Memphis-Shelby County Airport Authority Project Details Delivery Method Design-Build KEAR was selected as the hydrant fuel system contractor for the Concourse Modernization project at Memphis International Airport. The fuel system modifications were completed simultaneously with concourse upgrades which consisted of placing 25 passenger boarding bridges (PBBs) into a final configuration on the modernized Concourse

Memphis International Airport, TN, Concourse Modernization Hydrant Fuel System Read More »

Industrial site with pipeline valves and meters on a clear day, featuring a large storage tank and a fuel offload island in the background.

San Diego International Airport, CA, Fuel Offload Island and System Upgrades

Key Info Allied Aviation of San Diego Project Details Delivery Method Design-Bid-BuildKEAR was contracted to construct the new improvements to the jet fuel delivery system at the San Diego International Airport. A previous study identified the need for two additional refueler loading islands. The project involved various upgrades to the existing fuel load islands including

San Diego International Airport, CA, Fuel Offload Island and System Upgrades Read More »

Construction barriers and cones at an airport tarmac with ground service vehicles and airplanes visible in the background near Hydrant Fuel Pits under a clear blue sky.

Los Angeles International Airport, CA, Terminal 4 Gate Enhancement Hydrant Fuel Pits

Key Info American Airlines Project Details Delivery Method Design-Bid-BuildKEAR was contracted to complete hydrant fuel pit modifications for the Terminal 4 (T4) Gate Enhancement Project at Los Angeles International Airport. The project included the installation of new hydrant pits and associated lateral piping to facilitate revised aircraft parking configurations. KEAR executed all aspects of the

Los Angeles International Airport, CA, Terminal 4 Gate Enhancement Hydrant Fuel Pits Read More »

Construction area with rebar framework set up in a trench for the Fuel Hydrant Relocation, Nashville International Airport terminal and new PBBs in the background under a clear sky.

Nashville International Airport, TN, Fuel Hydrant Relocation for New PBB’s

Key Info Metropolitan Nashville Airport Authority Project Details Delivery Method Design-Build As the design-build prime contractor, KEAR was contracted to complete the design and installation of fuel hydrant relocations for new passenger boarding bridge layouts on A, B & C Concourses at Nashville International Airport. The existing passenger boarding bridges were original to the construction

Nashville International Airport, TN, Fuel Hydrant Relocation for New PBB’s Read More »