Wastewater Treatment Plants & Lift Stations

Entrance sign of Kartchner Caverns State Park with a mountain backdrop under a clear blue sky.

Kartchner Caverns, AZ, Water Treatment Plant & Water System Upgrade

Key Info Arizona Department of Administration Project Details Delivery Method Construction Manager at Risk   This CMAR project consisted of two phases. Phase 1 included the installation of a new Bioclere package Water Treatment Plant, refurbishment and reuse of existing concrete tanks, existing lift station upgrades and new piping & electrical systems. Also included in […]

Kartchner Caverns, AZ, Water Treatment Plant & Water System Upgrade Read More »

Industrial boiler room with large pipes, valves, and control panels on concrete walls in Sedona, AZ.

Sedona, AZ, Major Lift Station

Key Info City of Sedona Project Details Delivery Method Construction Manager at RiskKEAR was selected as the Construction Manager at Risk (CMAR) for the design and construction phase services for the major lift stations upgrades project. For the design phase of the project KEAR provided design phase cost budgeting, constructability reviews, value engineering and site investigations.

Sedona, AZ, Major Lift Station Read More »

Industrial water treatment facility with large pipes and tanks, equipped with ladders and railing under a clear sky.

Cannon Air Force Base, Clovis, NM, ADAL Wastewater Treatment Plant Expansion

Key Info US Army Corps of Engineers Albuquerque District Project Details Delivery Method Design-Bid-Build KEAR was proud to provide construction services on the ADAL WWTP Expansion project at Cannon Air Force Base in Clovis, New Mexico. The project was designed by CH2MHill and administered by the Albuquerque District of the US Army Corps of Engineers. The

Cannon Air Force Base, Clovis, NM, ADAL Wastewater Treatment Plant Expansion Read More »

Industrial water treatment facility in Lake Havasu City with large pink pipes and steel structures under a clear blue sky.

Lake Havasu City, AZ, Mulberry WWTP Tertiary Filter Capacity Increase

Key Info Lake Havasu City Project Details Delivery Method Design-BuildKEAR provided complete design-build services to upgrade 2 existing tertiary filters and add another to the existing filter train at the Lake Havasu Mulberry WWTP. The project included the relocation of two existing Schreiber Fuzzy Filters to allow for the installation of a third new filter

Lake Havasu City, AZ, Mulberry WWTP Tertiary Filter Capacity Increase Read More »

Two construction vehicles, a bulldozer and a compactor operated by the U.S. Army Corps of Engineers, working on dirt mounds in a large open field under a clear sky.

USACE Eunice, NM, Wastewater Treatment Plant Improvements

Key Info U.S. Army Corps of Engineers & City of Eunice Project Details Delivery Method Design-Bid-Build KEAR provided prime contractor construction services on the Eunice Wastewater Treatment Plant Improvements Project in Eunice, New Mexico. This project was part of the American Recovery and Reinvestment Act (ARRA) and was administered by the Albuquerque District of the US

USACE Eunice, NM, Wastewater Treatment Plant Improvements Read More »

Industrial shredder machine in a wastewater reclamation plant with a conveyor belt system under a metal roof.

Sedona, AZ, Wastewater Reclamation Plant Upgrades

Key Info City of Sedona Project Details Delivery Method Design-Bid-Build This project consisted of miscellaneous upgrades to the existing wastewater reclamation facility in the City of Sedona. The existing aeration system was upgraded and expanded to handle increased flows, including new aeration system, FRP baffles, new mixers and new return pumps. The existing solids handling building

Sedona, AZ, Wastewater Reclamation Plant Upgrades Read More »